Unity Repair Saves the Day at MRT Conlay & TU6 After

A Race Against Time: Securing the MRT Tunnel in 2020

The year 2020 saw a critical challenge arise during the construction of the MRT (Mass Rapid Transit) line in Kuala Lumpur. A leak erupted at the TBM (Tunnel Boring Machine) cutter head docking point at the TRX station, located nearly 1 kilometer underground. Unity Repair was called upon to deliver a swift and effective solution, ensuring the project's timely completion and structural integrity.

The Depths of the Challenge: Delivering Solutions Underground

The project presented a unique set of obstacles:

Remote Location

The leak site resided deep underground, posing logistical hurdles for material transportation and repairs.

High-Pressure Water

The gushing water pressure at the leak point further complicated the repair process.

Innovation Under Pressure: A Specialized Resin for a Rapid Fix

Unity Repair addressed the leak using injection of Soft Elastic Sealing Resin which offered several advantages:

  • Icon
    Fast Curing Time
  • Icon
    Flexibility

From Gushing Leak to Secure Connection: A Tunnel Secured

Prior to the project, the leak posed a significant threat to the MRT project:

Construction Delays

The leak could have significantly delayed the tunnel boring and station construction.

Structural Concerns

Uncontrolled water ingress could have compromised the structural integrity of the tunnel.

Safety Hazards

The high-pressure water posed a safety risk to construction personnel.

The successful project completion delivered a vital outcome:

Leak Stopped, Project Back on Track

The swift and effective leak sealing ensured the MRT project's continued progress.

Structural Integrity Maintained

The injected resin safeguarded the tunnel structure from water damage.

Enhanced Safety

By addressing the leak, Unity Repair minimized safety risks for construction workers.

Overcoming the Gush: A Testament to Ingenuity

The high water pressure while drilling the injection points demanded exceptional skill and specialized equipment from Unity Repair's team. Their ingenuity and perseverance proved crucial in overcoming this obstacle.

A Project for Continued Progress (if applicable)

While specific client testimonials are not available, the project's successful completion speaks volumes about its value for the overall MRT project's timely execution.

Long-Term Durability Beyond the Tunnel (consider revising if not applicable)

While the specific impact on long-term maintenance isn't mentioned, the project's contribution lies in ensuring the structural integrity of the MRT tunnel, fostering the MRT system's long-term functionality and passenger safety.

A Visual Journey Underground

Conclusion

The MRT Conlay & TU6 project exemplifies Unity Repair's commitment to providing innovative solutions for complex underground challenges. Our expertise and rapid response capabilities ensure the smooth progress of critical infrastructure projects like the MRT, contributing to a well-connected and efficient transportation network in Kuala Lumpur.

Your roof require professional attention

Book Your Appointment